Product Usage Tutorials for Nitrogen Fire Suppression System
Leave a message
1. System Routine Maintenance
Regular inspections are required to ensure system reliability. Users assume full responsibility for any consequences of improper maintenance. A comprehensive overhaul must be performed every three years, during which our company provides necessary spare parts and professional repair services.
2. Component Inspection
|
No |
component |
inspection items |
Inspection requirements |
Inspection frequency |
Maintenance method |
|
1 |
fire cabinet |
Storage pressure of nitrogen cylinder |
8MPa ≤ Storage pressure ≤ 15MPa |
once a month |
Fill with nitrogen gas |
|
Observation window |
No oil accumulation in the window |
once a month |
Replace the oil drain valve |
||
|
Inside the fire cabinet |
No traces of oil leakage |
once a month |
Check the oil leakage area and replace the relevant components |
||
|
Oil discharge electromagnet |
Reliable overlap between oil discharge solenoid and handle |
once a month |
Processing after inserting the locking pin |
||
|
Nitrogen cylinder electric contact pressure gauge |
Alarm triggered when storage pressure drops below 8MPa |
once a year |
Replace the electric contact pressure gauge |
||
|
heater |
Can start normally |
once a year |
Check the power supply, replace the heater and controller |
||
|
Oil discharge electromagnet |
Annual functional verification |
once a year |
Conducted during power outage of the main transformer |
||
|
Nitrogen injection electromagnet |
Annual functional verification |
once a year |
Conducted during power outage of the main transformer |
||
|
2 |
control cabinet |
power supply |
The power indicator light is indicating normally |
once a month |
Check the power supply or replace the power indicator light |
|
indicator light |
Equipment self-test, indicator light is on normally |
once a year |
Replace the display module |
||
|
control function |
Annual functional verification |
once a year |
Conducted during power outage of the main transformer |
||
|
3 |
pipeline |
sealing performance |
No oil leakage |
once a week |
Repair pipeline |
|
gasket |
The sealing gasket has no defects |
once a month |
Replace the sealing gasket |
||
|
bolt |
The connecting bolts are not loose |
once a year |
fastening bolt |
||
|
4 |
fire detector |
function |
Can send out fire signals normally |
once a year |
Replace the fire detector |
|
Insulation performance |
The fire detector has no abnormal grounding |
once a year |
Replace the fire detector |
||
|
5 |
Block valve |
function |
Smooth movement without any jamming |
once a year |
Replace the shut-off valve |
|
sealing performance |
No leakage or oil leakage |
once a year |
Replace the sealing gasket or shut-off valve |
||
|
alarm function |
After the shut-off valve is closed, it can send out an alarm signal normally |
once a year |
Replace the shut-off valve |
3. Nitrogen Replenishment
Cylinder pressure should be recorded monthly to ensure adequate pressure is maintained. Refilling should be scheduled as needed.
4. Nitrogen Filling Method
Standard 40L nitrogen cylinders are used. These can be detached and transported to a gas supply station for refilling.
5. Recovery After Activation
Following system activation, damaged components must be replaced before reuse. Required actions include:
Replacing affected or all fire detectors;
Replacing control cables on the transformer;
Inspecting the shut-off valve and replacing damaged gaskets;
Refilling the nitrogen cylinder;
Conducting full system recommissioning before returning to service.