Product Usage Tutorials for Nitrogen Fire Suppression System

1. System Routine Maintenance
Regular inspections are required to ensure system reliability. Users assume full responsibility for any consequences of improper maintenance. A comprehensive overhaul must be performed every three years, during which our company provides necessary spare parts and professional repair services.

2. Component Inspection

No

component

inspection items

Inspection requirements

Inspection frequency

Maintenance method

1

fire cabinet

Storage pressure of nitrogen cylinder

8MPa ≤ Storage pressure ≤ 15MPa

once a month

Fill with nitrogen gas

Observation window

No oil accumulation in the window

once a month

Replace the oil drain valve

Inside the fire cabinet

No traces of oil leakage

once a month

Check the oil leakage area and replace the relevant components

Oil discharge electromagnet

Reliable overlap between oil discharge solenoid and handle

once a month

Processing after inserting the locking pin

Nitrogen cylinder electric contact pressure gauge

Alarm triggered when storage pressure drops below 8MPa

once a year

Replace the electric contact pressure gauge

heater

Can start normally

once a year

Check the power supply, replace the heater and controller

Oil discharge electromagnet

Annual functional verification

once a year

Conducted during power outage of the main transformer

Nitrogen injection electromagnet

Annual functional verification

once a year

Conducted during power outage of the main transformer

2

control cabinet

power supply

The power indicator light is indicating normally

once a month

Check the power supply or replace the power indicator light

indicator light

Equipment self-test, indicator light is on normally

once a year

Replace the display module

control function

Annual functional verification

once a year

Conducted during power outage of the main transformer

3

pipeline

sealing performance

No oil leakage

once a week

Repair pipeline

gasket

The sealing gasket has no defects

once a month

Replace the sealing gasket

bolt

The connecting bolts are not loose

once a year

fastening bolt

4

fire detector

function

Can send out fire signals normally

once a year

Replace the fire detector

Insulation performance

The fire detector has no abnormal grounding

once a year

Replace the fire detector

5

Block valve

function

Smooth movement without any jamming

once a year

Replace the shut-off valve

sealing performance

No leakage or oil leakage

once a year

Replace the sealing gasket or shut-off valve

alarm function

After the shut-off valve is closed, it can send out an alarm signal normally

once a year

Replace the shut-off valve

3. Nitrogen Replenishment

Cylinder pressure should be recorded monthly to ensure adequate pressure is maintained. Refilling should be scheduled as needed.

4. Nitrogen Filling Method

Standard 40L nitrogen cylinders are used. These can be detached and transported to a gas supply station for refilling.

5. Recovery After Activation

Following system activation, damaged components must be replaced before reuse. Required actions include:

Replacing affected or all fire detectors;

Replacing control cables on the transformer;

Inspecting the shut-off valve and replacing damaged gaskets;

Refilling the nitrogen cylinder;

Conducting full system recommissioning before returning to service.

 